Building Graphics and Estimated Cost Budgets of Each Block


Project Phase One will be started in June 2006
. The pages contains graphics and estimated cost budget of each blocks. Building design and cost budgets are prepared by two experts in engineering in Nepal.

The Classrooms

There are two identical classroom blocks standing in a line and has a stair in between. In total, there are 20 classrooms; ten for junior students and ten for senior students. Each classroom has space for at least 15 students.

The sizes of the classrooms are 25ft x 30ft with a clear head 8ft. The corridors of the classrooms are facing south where we have a smoothly flowing river and beautiful view of the surrounding mountains.

Estimated Cost Budget of Junior School Block:

Names of Particular

Nepalise Rupees (NRS) { NRS 70 = $ 1 U.S.)
U.S Dollar ($) { $1 = NRS 70)
  • Foundation & Plinth:
547,235.00
7,817.64
  • Ground floor:
1,464,761.00
20,925.16
  • First floor:
1,096,653.00
15,666.47
Total:
3,108,649.00
44,409.27
  • 5% Electric cost:
155,432.45
2,220.46
  • 5% sanitary cost:
155,432.45
2,220.46
Sub Total:
3,419,513.90
48,850.20
  • 5% Contingency:
170,975.70
24,425.51
Grand Total:
3,590,489.60
51,292.71
Grant Toal In words:
Thirty Five Lakhas Ninety Thousands Four Hundred Eight Nine & Sixty Paisa Only
Fifty One Thousands Two Hundred Ninety Two and Seventy One Cent only.

The Hostal Blocks

Boys' and girl's hostals are two identical hostals. Boys' hostal on the left and girls' hostal on the left of the Kitchen and Dinning Hall. Both hostals have proper natural lighting and each block can accommodate up to fifty students. All the rooms have at least one window with great view of the surrounding environment.

Older students will have a room for three students. The ground floo of the hostal has ten rooms for them. Younger students who need to be cared by a foster parent, have bigger rooms on the first floor. These rooms can be shared up to 15 students. A room is designed for a foster parents/warden and the size of the room is same as other staff rooms.

Estimated Cost Budget of the Boys' Hostals

Name of Particular Nepalise Rupees (NRS) { NRS 70 = $ 1 U.S.) U.S Dollar ($) { $1 = NRS 70)
  • Foundation & Plinth:
250,262.00
3,575.17
  • Ground floor:
647,985.00
9,256.93
  • First floor
413,083.00
5,901.19
Total
1,311,330.00
18,733.29
5% Electric Cost
65,566.50
936.66
5% Sanitary Cost
65,566.50
936.66
Subtotal
1,442,463.00
20606.61
5% Contingency
72,123.15
1,030.33
Grant Total
1,514,586.15
21,636.95
Grant Total in Words
Fifteen Lakhas Fourteen Thousands Five Hundred Eight Six and Fifteen Paisa Only. Twenty One Thousand Six Hundred Thirty Six and 95 cent only.

The Common Kitchen and Dinning Hall

The common Dinning Hall and the Kitchen are both one-storied buildings with sloped roofing and have proper natural lighting. The hall has space for up to one hundred students and 20 staff members although staff residents are designed to have attached kitchens. The kitchen is for using fire wood because gays doesn't exist in the area.

The size of the dinning hall is 50ft by 40ft with 12 fts clear head. The size of the kittchen is 19ft by 25ft with 15ft clear head.

Estimated Cost Budget of Dinning Hall

Names of Particular Nepalise Rupees (NRS) { NRS 70 = $ 1 U.S.) U.S Dollar ($) { $1 = NRS 70)
Foundation & Plinth:
191,752.00
2,739.31
Ground floor:
515,780.00
7,368.29
Total
707,532.00
10,107.60
5% Electric Cost:
35,376.60
505.38
%Sanitary Cost:
35,376.60
505.38
Subtotal
778,285.20
11,118.36
5% Contingency
38,914.26
555.91

Grand Total

817,199.46

11,674.28

Estimated Cost Budget of Kitchen

Names of Particular Nepalise Rupees (NRS) { NRS 70 = $ 1 U.S.) U.S Dollar ($) { $1 = NRS 70)
Foundation & Plinth:
87,269.00
1,246.70
Ground floor:
246,669.00
3,523.84
Total
333,938.00
4,770.54
5% Electric Cost:
16,696.90
238.53
%Sanitary Cost:
16,696.90
238.53
Subtotal
367,331.80
5,247.60
5% Contingency
18,366.59
262.38
Grand Total
385,698.39
5509.99

Multipurpose Auditorium Hall

The auditorium Hall is designed to serve a community centre. All indoor public presentations and gathering will take place in the hall. While the school building works will be undergoing, workers will use the hall.

The hall size is 40ft width by 60ft length with 16ft clear head. The hight of the hall will be same as the other two-story blocks.

Estimated Cost Budget of the Auditorium Hall

Name Of Particulars Nepalise Rupees (NRS) { NRS 70 = $ 1 U.S.) U.S Dollar ($) { $1 = NRS 70)
Foundation & Plinth:
298,491.00
4,264.16
Ground floor:
580,887.00
8,298.39
Total
879,378.00
12,562.54
5% Electric Cost:
43,968.90
628.13
%Sanitary Cost:
43,968.90
628.13
Subtotal
967,378.00
13,819.69
5% Contingency
48,365.79
690.94
Grand Total
1,015,681.59
14,509.74

Note: Let us know if you like to receive more detailed information regarding each part of building work and their cost. The budgets and designs may differ slightly from actual cost and shapes. It is because the engineers don't have any experience working in a place like Limi and similar climate and geographical conditions. Also, the budgets doesn't include transportation of the building materials, which will be costly and difficult to transfer because of the remoteness and inaccesssibility of Limi.

 

 

 

 
Kailashzone Projects

  -

Map of the School Project

    *

Phase 1: Plan & Budgets

    *

Phase 2: Plan & Budgets

 

-

Management of the school

  -

Jangchub Ling Monastery

  -

Stories of how the monks came to India

Renovate Limi monasteries and search financial source for the monks

 

Donations and sponsorships are the entire source of funding for the Kailashzone Projects. Please help us to help others!!

   