frame_r copy
  ARTICLES ABOUT THE CULTURE, RELIGION & PEOPLE OF THE KAILASH REGIONS

Untitled Document
 
Kailashzone Projects

  -

Map of the School Project

    *

Phase 1: Plan & Budgets

    *

Phase 2: Plan & Budgets

 

-

Management of the school

  -

Jangchub Ling Monastery

  -

Stories of how the monks came to India

Renovate Limi monasteries and search financial source for the monks

 

Donations and sponsorships are the entire source of funding for the Kailashzone Projects. Please help us to help others!!

   

 

 
 
  Donate Us
  View our projects
  Introduction

All contents of this website © 2010 Kailashzone Charitable Foundation

 

 

 

 

Building Graphics and Estimated Budgets of Each Block

The following blocks will only be built after the completion of the Phase One Part of the school project. The Information about the block designs and the estimated cost budgets are prepared by two experts in engineering in Nepal.

At the Completion of the Phase One School Building Project, Limi School start to hold classes.

The Libarary, Science Laboratory, and Staff Office

The Science Laboratory and the Staff Office are on the ground floor. The Spacious library on the first floor is designed to have tables and chairs for studying in it.

The size of the Science Laboratory and the Staff Office are 30ft by 40ft with 8ft clear head. The library size is 30ft by 80ft with 8 ft clear head.

Estimated Cost Budget of The Science Laboratory, Library and Staff Office Block

Names of Particular

Nepalise Rupees (NRS) { NRS 70 = $ 1 U.S.)
U.S Dollar ($) { $1 = NRS 70)
  • Foundation & Plinth:
258,943.00
3,694.90
  • Ground floor:
864,530.00
12,350.43
  • First floor:
803,214.00
11,474.49
Total:
1,926,687.00
27,524.10
  • 5% Electric cost:
96,334.35
1,376.21
  • 5% sanitary cost:
96,334.35
1,376.21
Sub Total:
2,119,355.70
30,276.51
  • 5% Contingency:
105,967.79
1,513.83
Grand Total:
2,225,323.49
31,790.34
Grant Toal In words:
Twenty Two Lakhs Twenty Five Thousand Three Hundred Twenty Three and Fourty Nine Piasa.
Thirty One Thousand Seven Hundred Ninety and 34 cent.

The Staff Residents

Two staff residents blocks share the same internal designs and sizes. The staff block 'A' has an extra balcony and a common corridor and is designed for the senoir teachers. Each block has accommodation up to eight staff members. The sizes of the rooms are 11ft by 12ft and the kitchens are 5ft by 8ft with 8ft clear head.

Estimated Cost Budget of the Staff Resident "B"

Names of Particular

Nepalise Rupees (NRS) { NRS 70 = $ 1 U.S.)
U.S Dollar ($) { $1 = NRS 70)
  • Foundation & Plinth:
168,743.00
2,410.61
  • Ground floor:
739,775.00
10,568.21
  • First floor:
576,140.00
8,230.57
Total:
1,484,658.00
21,209.40
  • 5% Electric cost:
74,232.90
1,060.47
  • 5% sanitary cost:
74,232.90
1,060.47
Sub Total:
1,633,123.80
23,330.34
  • 5% Contingency:
81,656.19
1,165.17
Grand Total:
1,714,779.99
24,496.86
Grant Toal In words:
Seventeen Lakhas Four Thousands Seven Hundred Seventy Nine and Ninety Nine Piasa only

Twenty Four Thousands Four Hundred Ninety Six and Eight Six cent only

Estimated Cost Budget of the Staff Resident "A"

Names of Particular

Nepalise Rupees (NRS) { NRS 70 = $ 1 U.S.)
U.S Dollar ($) { $1 = NRS 70)
  • Foundation & Plinth:
233,278.00
3,332.54
  • Ground floor:
626,181.00
8,945.44
  • First floor:
752,088.00
10,744.11
Total:
1,611,547.00
23,022.10
  • 5% Electric cost:
80,577.35
1,151.11
  • 5% sanitary cost:
80,577.35
1,1,151.11
Sub Total:
1,772,701.70
25,324.31
  • 5% Contingency:
88,635.09
1,266.22
Grand Total:
1,861,336.79
26,590.53
Grant Toal In words:
Eighteen Lakhs Sixty One Thousands Three Hundred Thirty Six and Seventy Nine Piasa only.

Twenty Six Thousands Five Hundred Ninety and Fifty Three Cent Only.

The Health-Care Center

Health-Care Centre and Administrative Office have similar design and size. Both are single-story houses.

There is a room for medecines storage, a room for a doctor, and a kitchen. Some beds will be there to keep patiences in the clinic if it is necessary.

The three villages of Limi doesn't have a real clinic to go. Therefore, the Health-Care Centre is very important to have at the school and will also serve the villagers.

The size of the patiences room and lobby is 26fts by 23 ft and the size of the doctor's room and the medicine store room are 8ft by 8fts and and the size of the kitchen is 8ft by 5 ft with 8ft clear head.

Estimated Cost Budget of the Health Care Centre

Names of Particular

Nepalise Rupees (NRS) { NRS 70 = $ 1 U.S.)
U.S Dollar ($) { $1 = NRS 70)
  • Foundation & Plinth:
109,718.0
1,567.40
  • Ground floor:
299,608.00
4,280.11
Total:
409,326.00
5,847.51
  • 5% Electric cost:
20,466.30
292.38
  • 5% sanitary cost:
20,466.30
20,466.30
Sub Total:
450,258.60
6,432.27
  • 5% Contingency:
22,512.93
321.61
Grand Total:
472,771.53
6,753.88
Grant Toal In words:
Four Lakhas Two Thousands Seven Hundred Seventy One and Fifty Three Piasa only.

Six Thousand Seven Hundred Fifty Three and Eight Eight Cent only.

The Administrative Office

The administrative Office has an office for the school principle. There is a smaller room for storying students' and school files and a kitchen to prepare teas and lunches. The Receptoin room is the the biggest room where visitors wait and use as indoor meeting place.

The size of the Recenption is 23 ft by 16ft. The Principle Office is 8ft by 11ft . The file Storage is 8ft by 8ft and the kitchen is 8ft by 5 ft with 8ft clear head.

Estimated Cost Budget of the Adnimistrative Office

Names of Particular

Nepalise Rupees (NRS) { NRS 70 = $ 1 U.S.)
U.S Dollar ($) { $1 = NRS 70)
  • Foundation & Plinth:
109,718.0
1,567.40
  • Ground floor:
299,608.00
4,280.11
Total:
409,326.00
5,847.51
  • 5% Electric cost:
20,466.30
292.38
  • 5% sanitary cost:
20,466.30
20,466.30
Sub Total:
450,258.60
6,432.27
  • 5% Contingency:
22,512.93
321.61
Grand Total:
472,771.53
6,753.88
Grant Toal In words:
Four Lakhas Two Thousands Seven Hundred Seventy One and Fifty Three Piasa only.

Six Thousand Seven Hundred Fifty Three and Eight Eight Cent only.

The Guest House

Guest rooms are for school supporters, lecturers, and visitors.

All guest rooms have a great view of the surrounding environment and are designed to be spacious and private. It is expected the most guests would

Estimated Cost Budget of the Guest House

Names of Particular

Nepalise Rupees (NRS) { NRS 70 = $ 1 U.S.)
U.S Dollar ($) { $1 = NRS 70)
  • Foundation & Plinth:
168,743.00
2,410.61
  • Ground floor:
739,775.00
10,568.21
  • First floor:
576,140.00
8,230.57
Total:
1,484,658.00
21,209.40
  • 5% Electric cost:
74,232.90
1,060.47
  • 5% sanitary cost:
74,232.90
1,060.47
Sub Total:
1,633,123.80
23,330.34
  • 5% Contingency:
81,656.19
1,165.17
Grand Total:
1,714,779.99
24,496.86
Grant Toal In words:
Seventeen Lakhas Four Thousands Seven Hundred Seventy Nine and Ninety Nine Piasa only

Twenty Four Thousands Four Hundred Ninety Six and Eight Six cent only

Common Toilets

In total, there are six common toilets. Two smallers toilets are for the staff residents and the guest house. There are two common toilets for the hostals blocks and two common toilets for the academic blocks.

All toilets are separate for male and female and are designed to use as local system, which means no running water and all waste will use as fertilizer for growing barley and vegetable.

Estimated Cost Budget of the Guest House

Names of Particular

Nepalise Rupees (NRS) { NRS 70 = $ 1 U.S.)
U.S Dollar ($) { $1 = NRS 70)
  • Foundation & Plinth:
53,517.00
764.53
  • Ground floor:
211,573.00
3022.48
Total:
265,090.00
3,787.00
  • 5% Electric cost:
13,254.50
189.35
  • 5% sanitary cost:
13,254.50
189.35
Sub Total:
291,599.00
4,165.70
  • 5% Contingency:
14,579.95
208.29
Grand Total:
306,178.95
4,373.99
Grant Toal In words:
Three Lakhas Six Thousands One Hundred Seventy Eight and Ninety Five Paisa Only.

Four Thousand Three Hundred Seventy Three and Ninety Nine cent only.

 

 

 
Sacred sites at the Mount Kailash  |  Senge Tenzin Rinpoche  |  Ngari: western Tibet  
                                          |  Limi: northwestern Nepal  | Dolpo: eastern Nepal